With output up to 100 kVA and 510 kWh storage, this BESS supports peak load shaving, hybrid generation, and uninterrupted power supply for demanding applications.
• Large-capacity lithium battery
• Grid-connected and off-grid compatibility
• Parallel-ready for scaling
• Integrated EMS and inverter system
• Designed for harsh environments
• Mining operations
• Utility and grid support
• Renewable integration
• Event and emergency backup power
Max Output: ~100 kVA
Battery Capacity: ~510 kWh
Voltage: 415 V (three phase)
Dry Weight: ~7,500 kg
Footprint: ~6.0m x 2.4m
Charging Time: ~6–8 hrs