This mid-capacity BESS unit delivers 30 to 60 kVA hybrid output, ideal for reducing generator runtime and emissions in temporary or remote power setups.
• Scalable energy storage
• Intelligent load balancing
• Lithium-ion battery technology
• Silent operation
• Smart energy management system
• Construction sites
• Mining and infrastructure projects
• Backup power for critical systems
• Remote and noise-sensitive locations
Max Output: ~60 kVA
Battery Capacity: ~36 kWh
Voltage: 415 V (three phase)
Dry Weight: ~2,000 kg
Footprint: ~2.2m x 1.2m
Charging Time: ~2–4 hrs